U.S. Route 58/220 Bypass to North Carolina State Line Limited-Access Study

PROJECT WEBSITE: Martinsville Southern Connector Study

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Paused

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
PAUSED

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
SUBJECT TO CHANGE

2 out of 4

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Department of Transportation

LEAD AGENCY
Department of Transportation, Federal Highway Administration

Other Agencies with Actions or Authorizations:

No icon

Virginia

Department of the Interior

Department of the Interior, Fish and Wildlife Service

Department of the Army

Department of the Army, US Army Corps of Engineers - Regulatory

Description:

The Virginia Department of Transportation is evaluating potential transportation improvements along the U.S. Route 220 corridor between the U.S. Route 58/220 Bypass and the North Carolina state line. The Martinsville Connector Study is a first step toward identifying future improvements to the Route 220 corridor within its study limits, and will focus on a potential limited access road on a new location and/or will look at potential new improvements to Route 220.

The area for study generally covers Route 220 between Route 58 and the North Carolina state line. The specific geographic limits will be determined and refined through the course of the study.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete

Environmental and Community Outcomes

Categories
Historic and Cultural Resources

Design commitments for the Belleview and Marrowbone plantations include avoidance of encroachment on the properties per the NRHP nomination (Belleview) and the boundaries as depicted in the Virginia Cultural Resource Inventory System (VCRIS). The PA includes VDOT’s commitment to avoid encroaching on the boundaries of the Patterson, Price, and Watkins cemeteries as identified in VCRIS.