Major Infrastructure Projects
The following classifications of projects are contained within the Federal Infrastructure Permitting Dashboard:
The following classifications of projects are contained within the Federal Infrastructure Permitting Dashboard:
- Projects Identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act
- Department of Transportation (DOT) projects subject to Titles I, IX, and XI of the FAST Act
- Major infrastructure projects as defined in Section 3(e) of Executive Order 13807
- Other projects tracked on the Permitting Dashboard
It is important to note that a project’s inclusion on the Permitting Dashboard does not imply Federal endorsement of or support for the project or create a presumption that a covered project will be approved, favorably reviewed by any agency, or receive Federal funding. The inclusion of a project on the Permitting Dashboard may be reconsidered based on updated information related to, for example, a change in the scope of the Federal environmental review and authorization processes that apply to the project proposal.
The full project data set is now available in the new Permitting Dashboard Data Portal to download project and timeline information.
View a pre-filtered report created from the full project data set containing project level information only.
The infrastructure projects below are major infrastructure projects as defined in Section 3(e) of Executive Order 13807.
Title | Agency | Sector | Status | Category |
---|---|---|---|---|
Leavenworth National Fish Hatchery Surface Water Intake Fish Screens and Fish Passage Project | Department of the Interior, Bureau of Reclamation | Water Resources | In Progress | MIP Only |
Alkali Creek Reservoir Project | Department of the Interior, Bureau of Land Management | Water Resources, Irrigation and related water supply projects | In Progress | MIP Only |
Allston I-90 Multimodal Project | Department of Transportation, Federal Highway Administration | Surface Transportation, Highways | In Progress | DOT Projects |
Amite River and Tributaries-East of the Mississippi River, Louisiana, Flood Risk Management Feasibility Study | Department of the Army, US Army Corps of Engineers - Civil Works | Water Resources, Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) | In Progress | MIP Only |
Arrow Canyon Solar Project | Department of the Interior, Bureau of Indian Affairs | Renewable Energy Production, Solar | In Progress | MIP Only |
Bay State Wind Project | Department of the Interior, Bureau of Ocean Energy Management | Renewable Energy Production, Wind: Federal Offshore | Planned | FAST-41 Covered Projects |
BNSF Railway Bridge | Department of Homeland Security, US Coast Guard | Surface Transportation, Bridges | In Progress | MIP Only |
Boise River Basin Feasibility Study | Department of the Interior, Bureau of Reclamation | Water Resources, Irrigation and related water supply projects | In Progress | MIP Only |
Borderlands Wind Project | Department of the Interior, Bureau of Land Management | Renewable Energy Production, Wind: Other than Federal Offshore | Complete | FAST-41 Covered Projects |
Buffalo Bayou and Tributaries, Texas Resiliency Study | Department of the Army, US Army Corps of Engineers - Civil Works | Water Resources, Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) | Paused | MIP Only |
Campo Wind Project with Boulder Brush Facilities | Department of the Interior, Bureau of Indian Affairs | Renewable Energy Production, Wind: Other than Federal Offshore | Paused | MIP Only |
Collier County Coastal Storm Risk Management Project | Department of the Army, US Army Corps of Engineers - Civil Works | Water Resources, Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) | In Progress | MIP Only |
Commonwealth LNG Project | Federal Energy Regulatory Commission | Pipelines, Liquefied Natural Gas Terminal Facilities (Onshore or in State Water), and associated Natural Gas Pipelines | In Progress | MIP Only |
Coos Bay, Oregon Section 408/204(f) Channel Modification | Department of the Army, US Army Corps of Engineers - Civil Works | Ports and Waterways, Port expansion or improvement undertakings or projects | Paused | MIP Only |
Crimson Solar | Department of the Interior, Bureau of Land Management | Renewable Energy Production, Solar | In Progress | MIP Only |
Crow Creek Pipeline Project | Department of Agriculture, US Forest Service | Pipelines, Interstate Natural Gas Pipelines | Paused | MIP Only |
Dow Chemical Company's Harris Reservoir Expansion EIS | Department of the Army, US Army Corps of Engineers - Regulatory | Water Resources, Irrigation and related water supply projects | In Progress | MIP Only |
Eagle Shadow Mountain Solar Project | Department of the Interior, Bureau of Indian Affairs | Renewable Energy Production, Solar | Complete | MIP Only |
Earthquake Ready Burnside Bridge | Department of Transportation, Federal Highway Administration | Surface Transportation, Highways | In Progress | DOT Projects |
Empire Wind Energy Project | Department of the Interior, Bureau of Ocean Energy Management | Renewable Energy Production, Wind: Federal Offshore | Planned | FAST-41 Covered Projects |