USA Banner

Official US Government Icon

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure Site Icon

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Portions of this site may be affected due to a lapse in appropriations and associated shutdown/furloughs. Please monitor this page for updates on site availability and operating status.

FAST-41 Postings by Agencies for Attentive Energy Two Offshore Wind Project

Bureau of Ocean Energy Management (Posted on: )

FAST-41 Initiation Notice

From: Permitting Dashboard To: FAST41Initiation, OS; fast.fortyone@fpisc.gov Subject: [EXTERNAL] Webform submission from: FAST-41 INITIATION NOTICE Date: Friday, October 25, 2024 2:42:51 PM Greetings, Pursuant to Title 41 of Fixing America’s Surface Transportation Act 42 U.S.C. § 4370m (2016) (“FAST-41”), you have received an Initiating Notice for consideration to determine eligibility for coverage under FAST-41. You will have 14 days from the date of this submission to render a determination. Review the submission details below. This submission is also stored on the Permitting Dashboard and can be found in the “FIN Submissions” view page upon logging in. Permitting Dashboard user log in link: https://cms.permits.performance.gov/user [1] ======== Project Information ================================================= Project Title: Attentive Energy Two Offshore Wind Project - Sector:Renewable Energy Production [2] Type :Wind: Federal Offshore [3] - . Project Location Address: * *Street address 1:* 250 West 34th Street *Street address 2:* 3rd Floor, Suite 303 *City:* New York *State:* New York *Zip:* 10119 ------------------- .... Coordinates: * *Latitude:* N 39.767 *Longitude:* W 73.230 ---------------- . Project Sponsor Contact Information: * *Company Name/Agency:* Bureau of Ocean Energy Management *Project Sponsor:* Attentive Energy LLC *Street Address:* 250 West 34th Street *City:* New York *State:* New York *Zip:* 10119 *POC Name:* Laura Klewicki *POC Title:* Permitting Manager *POC Work Phone:* 713-739-4582 [4] *POC Email Address:* laura.klewicki@totalenergies.com [5] . Alternative Point Of Contact (Optional): ----------------------------- Project Purpose: The purpose of the Attentive Energy Two Offshore Wind Project (Project) is to develop an offshore wind energy generation facility within the Wind Development Area (WDA), which encompasses approximately 42,502 ac (17,200 ha) in the western portion of Lease Area OCS-A 0538, to provide renewable wind energy to New Jersey by the early 2030s. The Project will help meet state and national renewable energy goals and targets, such as diversifying the energy supply, increasing energy reliability, contributing to federal, state, and local economies, supporting the development of renewable energy infrastructure, and reducing greenhouse gas emissions. Additionally, the Project is being developed to meet Attentive Energy LLC’s obligations under the Board Order issued by the New Jersey Board of Public Utilities to deliver 1,342 MW of offshore wind energy, as measured at the Project point of interconnection, to New Jersey. ----------------------- ------------------------------------------------------- Project Description: The Attentive Energy Two Offshore Wind Project (Project) consists of a wind energy generation facility (including wind turbine generators, foundations, inter-array cables, and one offshore substation) within the Wind Development Area (WDA), which encompasses the western portion of Lease Area OCS-A 0538, offshore and onshore export cable facilities (offshore export cable corridor, offshore export cable, and onshore export cables), and an onshore converter station. The WDA is located in federal waters, approximately 36 nautical miles (nm) (68 kilometers [km]) from the nearest shoreline point in New Jersey and 47 nm (87km) from the nearest shoreline point in New York. The Project would interconnect at the Larrabee Collector Station, a substation in Howell Township, New Jersey. --- Technical and Financial Ability: Attentive Energy LLC is owned by affiliates of TotalEnergies and Corio Generation who together have extensive experience in project financing and developing offshore wind assets and a proven track record in successfully financing generation and transmission facilities. In compliance with BOEM regulations (30 CFR 585.516), Attentive Energy LLC will provide financial assurance that lessee obligations can be fulfilled prior to approval of the Construction and Operations Plan and prior to authorization to commence construction. Per 30 CFR 585.527, BOEM has the authority to allow evidence of financial strength and reliability to meet financial assurance requirements. As stipulated in the Lease, Attentive Energy LLC must provide and maintain at all times a surety bond or other form of financial assurance approved by the Bureau of Ocean Energy Management (BOEM). If at any time during the term of the Lease, BOEM requires additional financial assurance, Attentive Energy LLC will furnish the additional financial assurance required by BOEM within 90 days after receipt of the notice of such adjustment. ---------------- . Summary of Financing, Reviews and Authorizations: The Project will undergo various federal, state, and local reviews and authorizations to ensure compliance with applicable regulations throughout its construction, operations and maintenance, and decommissioning stages. The Bureau of Ocean Energy Management serves as the lead federal agency throughout the Project’s permitting stage, including the preparation of an environmental impact statement as required under the National Environmental Policy Act. Federal permits and authorizations include consultations under the Endangered Species Act and the Marine Mammal Protection Act, as well as the Clean Air Act and Clean Water Act. Additional approvals will be required for essential fish habitats, historical preservation under the National Historic Preservation Act, and activities impacting navigable waters under the Rivers and Harbors Act. At the state level, the Project will need Coastal Zone Management Act consistency certifications from both New Jersey and New York, among water quality certifications and other New Jersey state-specific permits. Decommissioning work of the Project will be undertaken in accordance with the regulations and requirements in place at the end of the Project’s life. The Project expects to be eligible for the Investment Tax Credit. . Project Assessment: The Attentive Energy Two Offshore Wind Project (Project) meets the definition of a covered project as defined in 42 U.S.C. §4370m(6)(A) of the FAST Act. This statute defines a covered project as one that requires federal authorization, is subject to the National Environmental Policy Act (NEPA), and involves infrastructure projects for renewable energy production. The Project requires multiple federal authorizations and an environmental impact statement under NEPA and will benefit from the timetable structure created for the federal permitting review. The streamlined and collaborative nature of FAST- 41 will support the timely and cost-effective delivery of the Project, contributing to state and national renewable energy goals and targets and the advancement of renewable energy infrastructure. Form Submitter Contact Information: * *Name:* Toriana Richards *Title:* Permitting Coordinator *Work Phone:* 774-268-1814 [6] *Email:* tori.richards@external.totalenergies.com [7] [1] https://cms.permits.performance.gov/user [2] https://www.permits.performance.gov/taxonomy/term/2656 [3] https://www.permits.performance.gov/taxonomy/term/2406 [4] tel:713-739-4582 [5] mailto:laura.klewicki@totalenergies.com [6] tel:774-268-1814 [7] mailto:tori.richards@external.totalenergies.com

Application and Supporting Documents

FINsee BOEM's webpage - https://www.boem.gov/renewable-energy/state-activities/attentive-energy-ocs-0538

Information on the status of mitigation measures

Will be determined in the Record of Decision (ROD). When complete, the ROD will be posted at the website noted above.

Description of the status of any litigation

None

Information about project-related public meetings, public hearings, and public comment periods

Refer to website noted above.

Description of any Federal agency action taken or decision made that materially affects the status of the project

Refer to website noted above.

Fish and Wildlife Service (Posted on: )

FAST-41 Initiation Notice

The lead agency has posted the FAST-41 Initiation Notice.

Application and Supporting Documents

None at this time.

Information on the status of mitigation measures

None at this time.

Description of the status of any litigation

NA

Information about project-related public meetings, public hearings, and public comment periods

NA

Description of any Federal agency action taken or decision made that materially affects the status of the project

NA

US Army Corps of Engineers - Regulatory (Posted on: )

FAST-41 Initiation Notice

Provided by lead agency. 

Application and Supporting Documents

Not available at this time. 

Information on the status of mitigation measures

No decisions on mitigation requirements made at this time. 

Description of the status of any litigation

NA

Information about project-related public meetings, public hearings, and public comment periods

Not available at this time. 

Description of any Federal agency action taken or decision made that materially affects the status of the project

No decision/final action taken at this time. 

National Oceanic and Atmospheric Administration (Posted on: )

FAST-41 Initiation Notice

Posted by lead agency.

Application and Supporting Documents

NA

Information on the status of mitigation measures

NA

Description of the status of any litigation

NA

Information about project-related public meetings, public hearings, and public comment periods

NA

Description of any Federal agency action taken or decision made that materially affects the status of the project

NA

Environmental Protection Agency (Posted on: )

FAST-41 Initiation Notice

Posted by lead agency

Application and Supporting Documents

Posted at this link when available:

Outer Continental Shelf permit: https://www.epa.gov/caa-permitting

CWA 402 (NPDES): https://www.epa.gov/npdes-permits

Information on the status of mitigation measures

N/A

Description of the status of any litigation

No litigation information at this time

Information about project-related public meetings, public hearings, and public comment periods

Posted at this link when available:

Outer Continental Shelf permit: https://www.epa.gov/caa-permitting

CWA 402 (NPDES): https://www.epa.gov/npdes-permits

Description of any Federal agency action taken or decision made that materially affects the status of the project

Posted at this link when available:

Outer Continental Shelf permit: https://www.epa.gov/caa-permitting

CWA 402 (NPDES): https://www.epa.gov/npdes-permits