Will be determined in the Record of Decision (ROD). When complete, the ROD will be posted on the website noted above.
None.
Refer to the website noted above.
Refer to website noted above.
Will be determined in the Record of Decision (ROD). When complete, the ROD will be posted on the website noted above.
None.
Refer to the website noted above.
Refer to website noted above.
BOEM has posted the FIN.
None at this time.
None at this time.
NA
FWS has no project-related public events.
None at this time.
Provided by lead agency.
https://www.nao.usace.army.mil/Media/Public-Notices/Article/3464960/nao-2013-00418-pn-3-cvow-virginia-beach-and-chesapeake-virginia/
N/A
The 10/404/408 Public Notice may be found here:
https://www.nao.usace.army.mil/Media/News-Stories/Article/3157796/nao-13-00418-coastal-virginia-offshore-wind-cvow-commercial-project/
Published by Lead Agency.
Link to MMPA Incidental Take Authorization site, which includes links to the application, the Notice of Receipt, and all other Federal Register publications (Proposed Rule and Final Rule) as well as supporting documents: https://www.fisheries.noaa.gov/action/incidental-take-authorization-dominion-energy-virginia-construction-coastal-virginia
NA
NA
See link provided above for the MMPA Incidental Take Authorization site, which provides links to Federal Register publications that include information about public review, etc.
NA
Posted by lead agency
Posted at this link when available:
Outer Continental Shelf permit: https://www.epa.gov/caa-permitting
N/A
No EPA litigation information at this time
Posted at this link when available:
Outer Continental Shelf permit: https://www.epa.gov/caa-permitting
Posted at this link when available:
Outer Continental Shelf permit: https://www.epa.gov/caa-permitting