USA Banner

Official US Government Icon

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure Site Icon

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

0123000202 - Del Norte STAA Improvements

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Complete

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE

icon_calendar

COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
10/04/2024

1 out of 1

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Caltrans

LEAD AGENCY
California, CalTrans

Description:

Purpose: The purpose of the proposed project is to construct improvements at spot locations along State Route (SR) 197 and United States (US) Highway 199 in Del Norte County to allow reclassification of the SR 197–US 199 corridor as part of the STAA network of truck routes. These improvements include widening lanes and modifying curve geometry at identified locations to accommodate standard STAA-sized vehicles while maintaining and improving safety for the traveling public.  Need:  All seven locations included as part of the proposed project have roadway geometries that can result in STAA trucks and other long-wheelbase vehicles off-tracking across the double yellow line and entering the oncoming traffic lane. Additionally, limited sight distance at all seven locations does not allow enough time for drivers to react to roadway conditions ahead. Lack of STAA truck access on the SR 197–US 199 corridor restricts options for goods movement between Crescent City and Interstate 5. Safety enhancing improvements, including wider lanes, wider shoulders, longer radius curves, and improved sight distances are needed to provide a roadway that is safer and easier to maneuver for all users. 

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete