0720000165 - LA-14, Capacity Improvement/Lane Drops Elimination

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

In Progress

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING

0 out of 0

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Caltrans

LEAD AGENCY
California, CalTrans

Description:

The California Department of Transportation, in cooperation with the North County Transportation Coalition (NCTC), proposes to close gaps between intersections by adding lane segments on SR-14 at the following locations: • S/B - Newhall Ave. to Via Princessa (PM 27.00 to PM 30.722)  • S/B - Sand Canyon Rd. to Agua Dulce Canyon Rd. (PM 33.423 to PM 40.034)  • N/B - Newhall Ave. to Golden Valley Rd. (PM 27.00 to PM 29.675) The purpose of this project is to eliminate bottleneck areas within the project limits, thereby improving the safety and operation of the freeway. Traffic volume is forecast to increase on SR-14 by 2040 and the addition of lanes to fill the gaps between intersections will help accommodate this increase.   The proposed work also includes realigning ramps, widening structures, constructing retaining walls, and modifying drainages. There is a low probability that utility relocations will be needed. Right of Way (ROW) acquisitions will likely be required.  

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete