0720000165 - LA-14, Capacity Improvement/Lane Drops Elimination
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects

LEAD AGENCY
California, CalTrans
Description:
The California Department of Transportation, in cooperation with the North County Transportation Coalition (NCTC), proposes to close gaps between intersections by adding lane segments on SR-14 at the following locations: • S/B - Newhall Ave. to Via Princessa (PM 27.00 to PM 30.722) • S/B - Sand Canyon Rd. to Agua Dulce Canyon Rd. (PM 33.423 to PM 40.034) • N/B - Newhall Ave. to Golden Valley Rd. (PM 27.00 to PM 29.675) The purpose of this project is to eliminate bottleneck areas within the project limits, thereby improving the safety and operation of the freeway. Traffic volume is forecast to increase on SR-14 by 2040 and the addition of lanes to fill the gaps between intersections will help accommodate this increase. The proposed work also includes realigning ramps, widening structures, constructing retaining walls, and modifying drainages. There is a low probability that utility relocations will be needed. Right of Way (ROW) acquisitions will likely be required.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
Milestone | Original Target Date | Current Target Date | Milestone Complete |
---|