1118000084 - SD-76 Culvert Rehab (Priority #15)
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
08/18/2023
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
California, CalTrans
Description:
The SR-76 corridor has approximately l 00 pipe culvert systems that have been identified with
deficiencies such as poor pipe, poor pipe invert, poor joint, poor inlet or outlet condition, and
poor waterway condition. Each system includes one or multiple culvert segments. The proposed
culvert rehabilitation strategies include replacement, sealing joint repair, alternative pipe liners
and possibly upsizing the pipe size where appropriate.
Additional end treatment repairs are needed along SR-76 which include, repairing flared end
sections and pipe end sections or headwalls, joint sealing/repair, stabilizing embankments, either
debris removal or sediment flushing, removing vegetation, regrading channels, and adding end
treatments.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
Milestone | Original Target Date | Current Target Date | Milestone Complete |
---|