1120000086 - SR-15 Operational improvements
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
01/25/2024
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects

LEAD AGENCY
California, CalTrans
Description:
Caltrans proposes to construct improvements along Interstate 5 (I-5) (from Post Mile [PM] 9.8 to R14.7), State Route 15 (SR-15) (from PM 0.4 to R0.5), Harbor Drive (from Imperial Avenue in San Diego to Mile of Cars Way in National City), and connecting arterials in the Cities of San Diego and National City, and within Naval Base San Diego in San Diego County. The proposed improvements consist of dedicated and mixed-flow truck-only lanes on Harbor Drive; intelligent transportation system (ITS) improvements on Harbor Drive, SR-15, and I-5; construction of a Vesta Street Bridge connecting the east (“dry”) and west (“wet”) sides of NBSD; improvements to on- and off-ramps at SR-15/Main Street and I-5/National Avenue; pavement rehabilitation of areas with poor condition on Harbor Drive and Main Street/Vesta Street; complete street improvements including upgraded bicycle and pedestrian facilities and Americans with Disabilities ramps; sustainability improvements including zero-emission commercial vehicle infrastructure; and ancillary improvements such as striping, landscaping and drainage, and modifications to existing NBSD gates.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
Milestone | Original Target Date | Current Target Date | Milestone Complete |
---|