Big Sycamore Creek Bridge Replacement

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

In Progress

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
11/03/2026

0 out of 1

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Caltrans

LEAD AGENCY
California, CalTrans

Description:

The California Department of Transportation (Caltrans) proposes to replace Big Sycamore Creek Bridge (Br. No. 52-11) including its seawall and Rock Slope Protection (RSP).The proposed project would replace the Big Sycamore Creek Bridge that was built in 1938, reconstruct and restore the damaged seawalls and rock slope protection that contribute to the protection of the bridge and roadway, construct an approximate 250-foot long secant wall next to the southbound lane, install rock slope drapery on the cliff immediately adjacent to the northbound side of the highway, reconstruct and reprofile sections of the roadway before and after the bridge, upgrade and reconstruct all existing safety and pavement elements, and install three stormwater treatment devices.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete