BRIDGE SEISMIC RETROFIT & UPGRADE BRIDGE RAILS

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

In Progress

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
05/05/2025

1 out of 1

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Caltrans

LEAD AGENCY
California, CalTrans

Description:

The project will address the potential vulnerability of San Gregorio Creek Bridge (Br. No. 35- 0030) by either seismically retrofitting or replacing the bridge. The existing bridge railing will also be replaced/upgraded to standard bridge rail. The project proposed the following three build alternatives (Alternatives 1, 2 and 3) and a No-build alternative. Alternatives 1 and 2 correspond with the seismic retrofit option, while Alternative 3 would replace the bridge: Alternative 1: Seismically retrofit the existing bridge and replace/upgrade existing concrete baluster railings in both directions. Alternative 2: Seismically retrofit and widen the existing bridge to construct a 6-foot wide sidewalk with a see through railing on southbound only, and replace/upgrade existing concrete baluster railings in both directions. The addition of the sidewalk is likely to require the creation of an additional column being placed in the creek bed. Alternative 3: Replace the existing bridge with a new bridge to provide: two standard 12-foot lanes (one in each direction), a 2-foot undivided median, standard 8-foot shoulders, 6-foot wide Class III Bike Lane in both directions (part of 8-foot shoulders), a 6-foot wide sidewalk (southbound only), standard bridge railings, and see through railings.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete