COA Braker Lane Extension
PROJECT WEBSITE: https://www.txdot.gov/projects/hearings-meetings/austin/archive/east-braker-lan…
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
06/14/2023
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
Texas
Description:
New four-lane arterial roadway is divided by medians with a median break at Taebaek Drive. Center-turn lanes for vehicles turning onto Taebaek Drive or Samsung Boulevard from Braker Lane. Sidewalks on both sides of the street along the project limits. Pedestrian crossing at Taebaek Drive to provide space for people walking, biking, and rolling to cross safely. Installation of a protected bicycle lane on the north side and an off-street bicycle lane on the south side. Extension of Taebaek Drive to connect to new East Braker Lane roadway. Curb, gutter and drainage improvements. Detention pond for runoff and water quality enhancements.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|