COL-20-Salt Creek Canyon
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
10/19/2026
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
California, CalTrans
Description:
This project is located in Colusa County along State Route 20 (SR 20) near Clearlake Park. It spans from a point 1.10 miles south of Lynch Canyon Trail to a point 0.50 miles north of East Marguerite Street. SR 20 is a two-lane, two-way rural highway. The primary enhancements for this project will be concentrated between Post Mile (PM) 10.3 and 11.8, approximately 2 miles to the west of Walnut Drive. A Road Safety Assessment report was conducted in November 2021 with the following partners: Caltrans; FHWA; City of Williams; Williams Police; Williams Fire; CHP; and Cal Fire. A joint workshop and an in-field review of the corridor was conducted on the segment of SR 20 and several short, mid-term, and long-term solutions were proposed, a number of which are included with this project. The primary objective of this project is to enhance safety at various locations along SR 20. To achieve this, the project seeks a programming amendment in the 2024 State Highway Operation and Protection Program (SHOPP) under the program code 20.XX.201.010, which falls under the Safety Improvement (SI) Program. See the signed scope agreement for full project description.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|