Cold Spring Bridge Maintenance Inspection Access
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
CLASS OF ACTION CHANGED
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
N/A
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
California, CalTrans
Other Agencies with Actions or Authorizations:
California
Description:
During the course of project development, it was determined that the following project could be down scoped and qualify as a categorical exclusion (CE). A CE was finalized on 7/9/2018 and the project is considered complete.
CEs are not required to be tracked on the Dashboard.
This is a bridge maintenance project intended to rehabilitate the existing Cold Spring Canyon Bridge by repainting the steel elements. The project also proposes to construct features attached to the bridge structure for enhanced inspection purposes. One alternative is the construction of catwalks; a second alternative is the installation of features such as hook and cabling along the same alignment as the catwalks to enhance safety of climbing crews or to enable secure connections for temporary scaffolding. The fixed platform alternative would construct catwalks within the center 600’ of the bridge span to the inside of the arch ribs to minimize visual impact. The workers would access the proposed installations via an Under Bridge Inspection Truck (UBIT) near the top of the arch ribs. The proposed system to enhance climbing operations or the installation of temporary scaffolding would involve attachments for hooks and/or cabling near the inside of each arch rib for the full 700’ length span. The painting of the bridge is to include maintenance of the low-reflectivity coating of the steel mesh on the pedestrian barrier. No exceptions to design standards are anticipated. Current plans include the installation of bird netting at all arch rib openings to restrict bird nesting.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
Milestone | Original Target Date | Current Target Date | Milestone Complete |
---|