CONSTRUCT A NEW IN-LINE EXPRESS BUS STATION IN THE MEDIAN
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
06/30/2027
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
California, CalTrans
Description:
The proposed project is located in the cities of Newark and Fremont, County of Alameda, and proposes to build a bus station facility on State Route 84 (SR 84) between 0.22 mile east of Paseo Padre Parkway interchange to 0.05 mile east of Lake Boulevard overcrossing over the Union Pacific Railroad (UPRR) Coast Subdivision to connect transit and private employee shuttle services with future improvements, such as the South Bay Connect (SBC) project at the Ardenwood Park-and-Ride. The project is located along a portion of SR 84 listed on the National Highway System. The project sponsor and implementing agency is Capitol Corridor Joint Powers Authority (CCJPA), and Caltrans will be the lead agency for the California Environmental Quality Act and for the National Environmental Policy Act (CEQA/NEPA). The project is both locally and federally funded. The project would enhance the connection with Transbay bus service and shuttle service from Alameda County to the Peninsula in San Mateo County and Santa Clara County. The proposed project is entirely within State right of way (ROW) which would not require acquisition of ROW. Temporary construction easements (TCE) would be required for proposed work adjacent to the UPRR undercrossings to allow for access and staging activities. Utility relocations are not anticipated. During construction, the contractor may require staging area(s) near the project for construction equipment storage, staging, and laydown. Potential staging areas include a location at the SR 84/Thornton Avenue interchange between the mainline and existing ramps and an area near the SR 84/Ardenwood Boulevard interchange. Nighttime work may be required.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|