Delano SR-155 Rehab (3R)

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Class of Action Changed

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
CLASS OF ACTION CHANGED

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
N/A

1 out of 1

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Caltrans

LEAD AGENCY
California, CalTrans

Description:

The California Department of Transportation (Caltrans) proposes to rehabilitate approximately 1.3 miles of State Route 155 in the City of Delano from Fremont Street
to 0.13 mile west of Browning Road. The work will be done under the 3R Program (resurfacing, restoration, and rehabilitation) of the State Highway Operation and Protection Program (SHOPP).
The major scope of work for this 3R project will include the following:
• Remove and replace HMA as recommended per the materials deflection study report
• Place RHMA, Type G, 0.10' thick for the entire pavement
• Include all applicable standards as required by a 3R rehabilitation such as shoulder
widening, cross-slope corrections, profile adjustment.
• Improve existing drainage systems by replacing CSP culverts with RCP culverts at:
Route 155/Fremont St, Route 155/Glenwood St and Route 155/High St.
• Provide standard curb ramps to be in compliance with ADA guidance and construct
missing segments of sidewalk.
• Improve/upgrade existing electrical systems including Traffic Control Systems, traffic
signals, loop detectors, pull boxes, and other electrical elements.
• Utility lines within State right of way paralleling the central portion of the project will be
relocated due to clear recovery zone requirements.
• Approximately 3 acres of new right-of-way will be needed to install drainage ditches and
construct a drainage basin. 

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete