Delaware River Bridge Project - PA Turnpike/I-95 Interchange Project Stage 3

PROJECT WEBSITE: https://www.paturnpike.com/traveling/construction/site/delaware-river-bridge

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

In Progress

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
07/24/2028

0 out of 9

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Department of Transportation

LEAD AGENCY
Department of Transportation, Federal Highway Administration

Other Agencies with Actions or Authorizations:

No icon

Pennsylvania

Department of Commerce

Department of Commerce, National Oceanic and Atmospheric Administration

Department of Homeland Security

Department of Homeland Security, US Coast Guard

Department of the Army

Department of the Army, US Army Corps of Engineers - Regulatory

Department of the Army

Department of the Army, US Army Corps of Engineers - Civil Works

Description:

he FHWA, in coordination with the PA Turnpike, the NJTA, and PennDOT, is advancing Stage 3 of the Pennsylvania Turnpike/Interstate 95 (PA Turnpike/I-95) Interchange Project in Bucks County, Pennsylvania and Burlington County, New Jersey.  Stage 3 includes rehabilitating or replacing the Delaware River Bridge to improve congestion and connectivity. Due to the amount of time elapsed since the 2003 ROD, the ongoing 'poor' condition of the structure, and the identification of new information, it was determined that any future development of the project will require a SEIS. The Stage 3 study area, which includes the Delaware River Bridge and extends east from the PA Turnpike mainline bridge over Mill Creek through the US 13 (Bristol Pike) Interchange, I-95 Exit #42 in Pennsylvania, to the first mainline NJ Turnpike horizontal curve in New Jersey. The total length of the project study area is approximately 3.2 miles with approximately 1.7 miles of the project in Pennsylvania and 1.5 miles of the project in New Jersey.
 

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete