Des Moines Transload Facility Environmental Assessment
PROJECT WEBSITE: Des Moines Area Metropolitan Planning Organization (DMAMPO)
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
08/27/2020
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects

LEAD AGENCY
Department of Transportation, Federal Railroad Administration
Description:
The Federal Railroad Administration (FRA) is completing an Environmental Assessment for the construction of the new Des Moines Transload Facility in Des Moines, Iowa. The Des Moines Area Metropolitan Planning Organization (DMAMPO) proposes to construct the transload facility in Central Iowa to reduce the volume of freight trucked within a 150-mile radius. The transload facility will use Class 1 and 2 freight rail shippers to transport goods in and out of the Des Moines area. Anticipated users of the facility include a wide variety of companies that handle large volumes of commodities that move most efficiently in railcar volumes: minerals, steel, chemicals, lumber, finished products, agricultural products, food, fertilizers, products for the development of Iowa’s growing wind energy industry, roofing materials, pipe, sheet metal, pilings, beams, plastics, aggregates, salts, oils, green bio-products, feed additives, generators, transformers, farm machinery, construction equipment, and military equipment.
For more information visit FRA's project page:
https://railroads.dot.gov/environment/environmental-reviews/des-moines-transload-facility
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
Milestone | Original Target Date | Current Target Date | Milestone Complete |
---|