District 10 Substructure Repairs
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
CLASS OF ACTION CHANGED
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
N/A
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
California, CalTrans
Other Agencies with Actions or Authorizations:
Department of the Interior, Fish and Wildlife Service
Department of Commerce, National Oceanic and Atmospheric Administration
Department of Defense, US Army Corps of Engineers - Regulatory
Description:
During the course of project development, it was determined that the following project could be down scoped and qualify as a categorical exclusion (CE). A CE was finalized on 7/18/2018 and the project is considered complete.
CEs are not required to be tracked on the Dashboard.
This project proposes structural preventative measures for the bridges to keep their structural integrity and delay major rehabilitation. Erosion control measures are proposed for the waterways were needed, to restore the bank and bed erosion and protect them from further material loss. The scope, type and extent of work varies for each structure.
General description of the proposed work is: Back fill eroded areas, place rock slope protection, rehabilitate reinforces concrete columns, protect reinforcements from corrosion, replace bridge approach slabs and joint seals, treat bridge deck with Methacrylate, paint bridge deck and remove silt buildup from a culvert. Temporary Construction Easements (TCEs) are required for five bridges: BR 39 0035L, Br 38 0062, Br 38 0039, Br 29 0014, and Br 29 0008R. Water diversion is required for San Luis Wasteway, and canal shutdown are required at Arroyo Canal and Snake Ravine.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
Milestone | Original Target Date | Current Target Date | Milestone Complete |
---|