ELK CREEK BRIDGE REPLACEMENT PROJECT
PROJECT WEBSITE: https://dot.ca.gov/caltrans-near-me/district-1/d1-projects/elk-creek-bridge
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
05/06/2022
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
California, CalTrans
Description:
The California Department of Transportation (Caltrans) is proposing to replace Elk Creek Bridge (State Bridge Inventory Number 10-0120) on State Route (SR) 1 at post mile (PM) 31.5 in Mendocino County. The project is south of the unincorporated community of Elk in Mendocino County. The area surrounding the bridge is hilly with scattered vegetation and grazing land. The existing Elk Creek Bridge is a 122-foot-long structure with two 11-foot lanes and 2-foot shoulders. The bridge was constructed in 1938 and is a continuous three-span, cast-in-place reinforced concrete bridge.
The proposed project would improve the function and geometrics of the Elk Creek Bridge and approach roadway to ensure uninterrupted traffic movement in the event of a collision or emergency incident, seismic event, or other catastrophic failure, and provide safe access for pedestrians and bicyclists across the bridge. The design of the proposed project would improve traffic flow with upgrades to the bridge approach by widening the shoulders and decreasing the curve radius, thus improving safety and reducing the potential for accidents and collisions on the bridge. It would also improve pedestrian/bicycle access and safety.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|