FM 1385 Reconstruction and Widen

PROJECT WEBSITE: https://www.txdot.gov/projects/hearings-meetings/dallas/2023/fm1385-from-us380-…

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Complete

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE

icon_calendar

COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
07/14/2023

1 out of 1

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Texas

LEAD AGENCY
Texas

Description:

The proposed FM 1385 would be reconstructed and widened from an existing two-lane rural highway to ultimately a six-lane divided urban roadway. FM 1385 from US 380 to FM 428 West is proposed to be constructed as a 6-lane facility while the roadway from Fm 428 West to FM 455 is proposed to be constructed as a 4-lane interim facility.

Most of the project area follows the existing FM 1385 roadway alignment; however, two areas are being proposed for new location roadway realignments to address mobility and safety concerns:

The 0.9-mile-long realignment is located south of Mustang Road and would directly connect FM 1385 to the north and to the south without requiring vehicles to travel along the Mustang Road portion of the existing FM 1385.

The 0.45-mile realignment is located southeast of the current alignment. This proposed improvement would flatten out the existing “S” curve at Gee Road and improve mobility at this intersection with FM 1385.

The bridges and culverts (Mustang Creek bridge, Little Elm Creek Relief bridge, Little Elm Creek bridge, and Long Branch bridge class culvert) would be reconstructed and widened to accommodate the additional roadway width.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete