FM 1777

PROJECT WEBSITE: https://www.txdot.gov/projects/hearings-meetings/dallas/2024/fm1777-from-sh66-t…

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Complete

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE

icon_calendar

COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
03/28/2025

1 out of 1

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Texas

LEAD AGENCY
Texas

Description:

Proposed facility is four (ultimate six) 12-foot-wide travel lanes, two in each direction (three ultimate) (north and south), intermittent turn lanes, an 18-foot raised grass median, curb and gutter drainage, a 6-foot-wide sidewalk on the west side, and a 10-foot-wide shared use path on the east side. Proposed ROW will be typically 140 feet, max. 195 feet, min. 140 feet. In some locations right-turn-lanes were added in several areas that have increased the ROW to 195 feet wide. Proposed realignment of the FM 1777 road would be located between county road (CR)636 and county road (CR) 677, to avoid displacements of 4(f) historic structures. 

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete