FM 2185
PROJECT WEBSITE: https://www.txdot.gov/projects/projects-studies/el-paso/fm2185.html
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
03/06/2024
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
Texas
Description:
The proposed FM 2185 roadway would consist of a Super 2 roadway with one 12-foot-wide travel lane in each direction with a 12-foot-wide passing lane along alternating sides of the roadway. Directions of travel would be separated by a 2-foot-wide, flush, at-grade median, and 10-foot-wide shoulders would be constructed along both sides of the roadway. Drainage would continue to consist of an open ditch drainage system, with a proposed 6-foot-wide drainage ditch along alternating sides of the roadway. Twenty-one bridge-class culverts and 43 non-bridge-class culverts are proposed as part of the FM 2185 drainage system.
The proposed improvements would require approximately 154.86 acres of additional ROW, and the proposed ROW would be approximately 120 feet wide.
Drainage along FM 812 would use roadside ditches, cross culverts, and storm sewer systems. Bridges over stream crossings would be designed to convey a 50-year storm event which would include reconstructing existing bridges to raise the profile as well as increasing the span length.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|