Grant Line Rd Reconstruction
PROJECT WEBSITE: http://www.connectorjpa.net/rancho-cordova-d2.html
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
09/30/2019
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
California, CalTrans
Other Agencies with Actions or Authorizations:
California
Department of the Army, US Army Corps of Engineers - Regulatory
Department of the Interior, Fish and Wildlife Service
Description:
The Capital SouthEast Connector Joint Powers Authority (Connector JPA) in conjunction with the County of Sacramento, City of Rancho Cordova and Caltrans is working on preliminary engineering and environmental analysis to further develop the 7.4-mile Connector D2 segment. The Connector D2 project will widen Grant Line Road from two lanes to four lanes from just north of the White Rock Road intersection south to Highway 16 (Jackson Highway). The proposed alignment will generally follow the existing Grant Line Road with minor adjustments to avoid wetland preserves. The project may also include frontage roads or private driveways to maintain existing access for adjacent properties.
There will be nine access connections as part of the Connector D2 segment (existing intersections and planned intersections not in existence today):
White Rock Road
Centennial Avenue (joined with Raymer Road)
Douglas Road
North Loop Road (temporary signal)
Chrysanthy Boulevard
University Avenue
Kiefer Boulevard
Rancho Cordova Parkway
Jackson Road
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
Milestone | Original Target Date | Current Target Date | Milestone Complete |
---|