Hamner Avenue Bridge Replacement

PROJECT WEBSITE: Hamner Bridge over Santa Ana River

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Class of Action Changed

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
CLASS OF ACTION CHANGED

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
N/A

0 out of 0

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Caltrans

LEAD AGENCY
California, CalTrans

Description:

During the course of project development, it was determined that the following project could be down scoped and qualify as a categorical exclusion (CE). The CE was signed on April 8, 2019.
 
CEs are not required to be tracked on the Dashboard.
 
The City of Norco, in cooperation with the County of Riverside Transportation Department and the California Department of Transportation (Caltrans), proposes to replace the existing Hamner Avenue Bridge (Bridge Number 56C0446) over the Santa Ana River and widen Hamner Avenue from Detroit Street to Citrus Street in the City of Norco, Riverside County, California. The project covers a distance of approximately 0.7 mile. The new bridge would include three 12-foot lanes and a 4-foot shoulder in each direction (northbound and southbound) separated by a 4-foot curbed median, along with a 12-foot barrier separated multipurpose trail on the east side of the bridge. To the north and south of the bridge, Hamner Avenue would include three 12-foot lanes and a 4-foot shoulder in each direction along with a 5-foot sidewalk on the east side of the roadway. At the intersection with Citrus Street, two northbound dedicated left-turn lanes would be included. At the intersection with Detroit Street, one southbound dedicated left-turn lane would be included. Shoulders would taper down and stop before reaching both intersections to match the roadway striping north of Citrus Street and south of Detroit Street. A trail ramp would be constructed at the northeast and southeast ends of the bridge to connect the planned Regional Santa Ana River Trail with the barrier-separated multipurpose trail on the new Hamner Avenue Bridge. The project would also include relocating utilities, constructing retaining walls, and installing temporary signage.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete