High Desert Corridor - New State Route 138 Project
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
PAUSED
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
SUBJECT TO CHANGE
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects

LEAD AGENCY
California
Other Agencies with Actions or Authorizations:
Department of the Interior, Fish and Wildlife Service
Department of the Army, US Army Corps of Engineers - Regulatory
Description:
The project is located in the counties of Los Angeles and San Bernardino on State Route (SR) 138 from SR-14, continuing east to Llano where it connects to the SR-18 in Apple Valley. The total length of the project is approximately 63 miles. Within the limits of the proposed project, most of SR-138 from Avenue T to the SR-138/SR-18 junction has been recently widened to four lanes, with three segments remaining to be widened from two to four lanes. SR-18 varies from two to four lanes, except for the section on Interstate 15 (I-15) that consists of six lanes. The purpose of the proposed project is to improve east-west mobility through the High Desert region of southern California to accommodate existing and future transportation demand, improve travel safety and reliability, improve the regional goods movement network, provide improved access and connectivity to regional transportation facilities, and contribute to state greenhouse gas (GHG) reduction goals.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
Milestone | Original Target Date | Current Target Date | Milestone Complete |
---|