I-110/Adams Terminus Improvement Project
PROJECT WEBSITE: https://www.metro.net/projects/110-adams-terminus-improvement-project/
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
CANCELLED
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
N/A
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
California, CalTrans
Description:
The California Department of Transportation (Caltrans)in cooperation with the Los Angeles County Metropolitan Transportation Authority, proposes a terminus improvement project to reduce congestion on the I-110/Adams Blvd. off-ramps, Adams Blvd., and nearby intersections. The first proposed Build Alternative includes an elevated off-ramp structure on the Northbound Interstate (I-110) between 30th Street and Figueroa Street Overcrossing in the City of Los Angeles. The proposed structure would bypass the bottleneck intersections at Flower Street and Adams Boulevard and Northbound I-110 High-Occupancy Toll (HOT) off-ramp to Adams Blvd., connecting HOT lane traffic to Figueroa Street. The second proposed Build Alternative includes a dedicated High Occupancy Vehicle (HOV)/HOT lane alternative on Adams Blvd.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
Milestone | Original Target Date | Current Target Date | Milestone Complete |
---|