I-15; South Cedar Interchange EA
PROJECT WEBSITE: http://www.udotinput.utah.gov/southcedar
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
12/04/2024
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
Utah
Other Agencies with Actions or Authorizations:
Department of the Interior, Fish and Wildlife Service
Description:
The Utah Department of Transportation (UDOT) has prepared an Environmental Assessment (EA) to evaluate the transportation needs of the interchange at the I-15 South Main Exit (Exit 57) in Cedar City, Iron County, Utah. The EA identified the best solution to improve existing and future traffic congestion in the interchange system, including adjacent signalized intersections, while taking into account any potential impacts on the natural and built environments. The EA was signed on 8/15/2024 and an open comment period was available to the public until 10/7/2024. UDOT signed a Finding of No Significant Impact (FONSI) on 12/4/2024 that can be viewed on the project website.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|