I-395/Route 9 Transportation Study

PROJECT WEBSITE: I-395/Route 9 Transportation Study

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Complete

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE

icon_calendar

COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
06/23/2016

1 out of 1

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Department of Transportation

LEAD AGENCY
Department of Transportation, Federal Highway Administration

Description:

MaineDOT and the Federal Highway Administration (FHWA)
are conducting this study to:

1.  Improve regional system linkage

2.  Improve safety

3.  Improve the current and future flow of traffic and the shipment of goods between I-395
and Route 9

4.  Avoid and minimize adverse impacts to natural, social, cultural, and economic resources and features

It is envisioned that the results would be the construction of a new two-lane road from I-395 to Route 9 or improvements to existing roads. If a new two-lane road is constructed, it would be a limited-access road crossing over or under the intersecting streets. The only exception could be a new interchange with Route 1A.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete