I-880 INTERCHANGE IMPROVEMENTS PROJECT – Whipple Road-Industrial Parkway Southwest and Industrial Parkway West

PROJECT WEBSITE: https://www.alamedactc.org/programs-projects/highway-improvement/880whippleindu…

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Paused

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
PAUSED

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
SUBJECT TO CHANGE

2 out of 3

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Caltrans

LEAD AGENCY
California, CalTrans

Other Agencies with Actions or Authorizations:

Department of the Army

Department of the Army, US Army Corps of Engineers - Civil Works

Description:

The California Department of Transportation (Caltrans), as assigned by FHWA, in cooperation with Alameda CTC, Hayward, and Union City, proposes to provide interchange and local roadway improvements along Interstate 880 (I-880) from 0.6 mile south of the I-880/Whipple Road-Industrial Parkway Southwest Interchange to 0.3 mile north of the I-880/Industrial Parkway West Interchange. The I-880 Interchange Improvements Project (project) would include interchange on- and off-ramp reconfigurations, modifications and/or replacement of bridge structures, local roadway realignments and restriping, and bicycle and pedestrian improvements in the cities of Hayward and Union City.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete