IH 610 Elevated Car Lanes

PROJECT WEBSITE: Open House - I-610 Elevated Express Lanes

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Paused

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
PAUSED

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
SUBJECT TO CHANGE

1 out of 2

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Texas

LEAD AGENCY
Texas

Description:

TxDOT proposes to construct four elevated express lanes (two in each direction) primarily in the center of IH 610 West Loop mainlanes from IH 10 West to IH 69 (US 59) South, a distance of approximately 3.7 miles in Houston, Harris County, Texas. The express lanes would not be tolled. Although the project’s logical termini limits are from IH 10 to IH 69 (US 59), the actual construction limits would extend beyond each limit in order to transition back into the existing highway configuration. The transition would extend to approximately 140 feet south of IH 69 (US 59) and approximately 505 feet north of IH 10.TxDOT proposes to construct four elevated express lanes (two in each direction) primarily in the center of IH 610 West Loop mainlanes from IH 10 West to IH 69 (US 59) South, a distance of approximately 3.7 miles in Houston, Harris County, Texas. The express lanes would not be tolled. Although the project’s logical termini limits are from IH 10 to IH 69 (US 59), the actual construction limits would extend beyond each limit in order to transition back into the existing highway configuration. The transition would extend to approximately 140 feet south of IH 69 (US 59) and approximately 505 feet north of IH 10.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete