Inglewood Transit Connector Project

PROJECT WEBSITE: Envision Inglewood - Inglewood Transit Connector

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Complete

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE

icon_calendar

COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
03/16/2023

2 out of 2

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Department of Transportation

LEAD AGENCY
Department of Transportation, Federal Transit Administration

Description:

The Inglewood Transit Connector Project is a proposed automated transit system to improve overall mobility and levels of service, address projected future congestion, provide access to transit to its priority populations, and advance its sustainability goals. The proposed project would include an electrically propelled driverless train transit system operating on an approximately 1.6-mile long, elevated fixed-guideway primarily located within the public right-of-way along Market Street, Manchester Boulevard, and Prairie Avenue. Three stations are proposed along the alignment on privately-owned land that would be acquired as part of the proposed Project. The elevated guideway consists of two lanes to support multiple trains traveling in one direction on a single lane before switching lanes at the end of line station for the return trip.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete

Environmental and Community Outcomes

Categories
Changes to the project’s environmental and community effects:
Minimization of effects