Lowell Hill Curves Realign roadway, improve curves, and widen shoulder widths

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Complete

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE

icon_calendar

COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
04/06/2021

3 out of 3

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Caltrans

LEAD AGENCY
California, CalTrans

Other Agencies with Actions or Authorizations:

California

California

No icon

Department of Defense, US Army Corps of Engineers - Regulatory

Description:

The California Department of Transportation (Caltrans) proposes to improve two non-contiguous segments of the alignment of State Route (SR) 20 in Nevada County between post miles (PM) 29.7-30.9 and 36.8-39.8 by modifying the existing horizontal and vertical curves of the roadway and adding turnouts. This project will update the roadway to current standards by increasing the curve radii, widening shoulders to 8 feet, adding turnouts for both directions, and improving the vertical profile grade. Additionally, this project will improve the clear recovery zone (CRZ) by removing obstacles and flattening slopes close to the traveled way. Two main project segments occur between PM 29.7-30.9 and 36.8-39.8 are referred to as White Cloud and Lowell Hill segments respectively.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete