MacArthur Maze/Increase Vertical

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Complete

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE

icon_calendar

COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
02/07/2020

2 out of 2

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Caltrans

LEAD AGENCY
California, CalTrans

Other Agencies with Actions or Authorizations:

California

California

Description:

The California Department of Transportation (Caltrans) proposes the MacArthur Maze Vertical Clearance Project (project or proposed action) to increase the vertical clearances at three locations within the MacArthur Maze Interchange (MacArthur Maze or Maze) in the City of Oakland, Alameda County. Two of the locations are along the connector from westbound (WB) Interstate 80 (I-80) to southbound (SB) Interstate 880 (I-880), as it crosses below the WB and eastbound (EB) Interstate 580 (I-580) overcrossings. The third location is along the connector from WB I-80 to EB I-580 as it crosses below the connector from WB I-580 to WB I-80. The existing vertical clearance at these three locations does not meet the current Caltrans standard of 16 feet 6 inches and impedes the safe and efficient movement of oversized vehicles and loads through the Maze. The project is proposed to increase the vertical clearance of the structures in the Maze to allow for more efficient travel of oversized vehicles.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete