MacArthur Maze/Increase Vertical
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
02/07/2020
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
California, CalTrans
Other Agencies with Actions or Authorizations:
California
Description:
The California Department of Transportation (Caltrans) proposes the MacArthur Maze Vertical Clearance Project (project or proposed action) to increase the vertical clearances at three locations within the MacArthur Maze Interchange (MacArthur Maze or Maze) in the City of Oakland, Alameda County. Two of the locations are along the connector from westbound (WB) Interstate 80 (I-80) to southbound (SB) Interstate 880 (I-880), as it crosses below the WB and eastbound (EB) Interstate 580 (I-580) overcrossings. The third location is along the connector from WB I-80 to EB I-580 as it crosses below the connector from WB I-580 to WB I-80. The existing vertical clearance at these three locations does not meet the current Caltrans standard of 16 feet 6 inches and impedes the safe and efficient movement of oversized vehicles and loads through the Maze. The project is proposed to increase the vertical clearance of the structures in the Maze to allow for more efficient travel of oversized vehicles.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
Milestone | Original Target Date | Current Target Date | Milestone Complete |
---|