MAD-99-NORTH MADERA 99 6-Lane
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
04/03/2028
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
California, CalTrans
Description:
The project would widen SR 99 from a 4-lane freeway to a 6-lane freeway between Post Mile (PM) 15.1 and PM 19.9. The project would remove and replace the existing pavement with 0.25 foot of Hot Mix Asphalt (HMA) and 1.10 feet of Continuously Reinforced Concrete Pavement (CRCP). The two new lanes
would receive the same proposed treatment. Also, the project would install inside and outside shoulders rumble strips along the SR 99 northbound and southbound lanes. The project would also remove and replace three culverts at PM 16.91, PM 17.1 8 and PM 19.04. The project would remove and replace the Berenda Creek bridge at PM Rl 6.10 and the Dry Creek bridge at PM 17 .86.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|