Medicine Lodge Municipal Airport Environmental Assessment

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Complete

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE

icon_calendar

COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
03/09/2022

2 out of 2

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Aviation

SECTOR
Aviation

Project Category

CATEGORY
Project Category DOT Projects

Department of Transportation

LEAD AGENCY
Department of Transportation, Federal Aviation Administration

Description:

The Sponsor wishes to prepare an Environmental Assessment (EA) for the Medicine Lodge Municipal Airport. Projects to be covered in the EA include:
1. Remove obstructions to comply with FAR Part 77 airspace surfaces as well as proposed Runway Safety Areas (RSA) and OFAs
2. Rehabilitate Runway 16-34
3. Decommission and abandon north-south paved Runway 16-34
4. Abandon current terminal area and relocate facilities to the east and northwest of proposed Runway 18-36 to meet RSA & OF A standards
5. Construct a new Runway 18-36 (3,200' x 60') with aircraft turnarounds at each threshold; to replace Runway 16-34 and meet Airport Reference Code (ARC) B-I standards
6. Install Precision Approach Path Indicators (PAPIs) and Runway End Identifier Lights (REILs) for Runway 18-36
7. Develop new instrument approach procedures- Runway 18-36 RNAV (GPS)
8. Land Acquisition
9. Decommission and abandon turf crosswind runway 13-31

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete