MPA-49 Mariposa Pavement Anchor Project

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

In Progress

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
11/20/2026

0 out of 1

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Caltrans

LEAD AGENCY
California, CalTrans

Description:

The purpose of this project is to restore the facility to a state of good repair by rehabilitating the roadway, reducing maintenance expenditures by the Department, and providing safe conditions for Field Maintenance by reducing excessive exposure to moving traffic. The project is needed because the projected pavement condition, according to the 2019 APCS data, ready to list year 2027, shows the condition of the pavement within the proposed project limits, in need of minor rehabilitation. Not promptly implementing maintenance strategies reduces the design life and level of service resulting in increasing costs to maintain and challenges for field maintenance staff to repair SR 49 in a condition that is adequate for the traveling public.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete