MRN-101/580 Direct Connector

PROJECT WEBSITE: District 4 Environmental Documents by County

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

In Progress

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
01/08/2027

0 out of 1

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Caltrans

LEAD AGENCY
California, CalTrans

Description:

Project Development Support (PSR-PDS) is sponsored by the Transportation Authority of Marin (TAM) and proposes to improve local and multi-modal access to Interstate 580 (I-580) and construct a 2-lane freeway to freeway connector between northbound (NB) US Route 101 (US 101) and eastbound (EB) Interstate 580 (I-580). The existing interchange does not have a direct connection for this direction of travel and vehicles currently must use local streets to complete this traffic move. The US 101/I-580 Multi-modal and Local Access Improvement project is located in the City of San Rafael, within Marin (Mrn) County, California. Project partners include the Transportation Authority of Marin (TAM), Caltrans, and the City of San Rafael. The project proposes to improve regional connectivity between northbound US-101 and eastbound I-580, by separating regional traffic from local traffic and placing it on the proposed direct connector, and to enhance multi-modal and local access in the area. The project limits are at the US 101/I-580 interchange along US 101 from PM 8.0 to PM 10.3 and along I-580 from PM 2.48 to PM 4.79. This project is funded by Regional Measure 3 (RM3) funds and TAM Measure AA. 

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete