North-South Corridor Study Tier 1 EIS
PROJECT WEBSITE: ADOT North-South Corridor Study Tier 1 EIS Project Overview
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
08/06/2021
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
Arizona
Description:
A highway study to evaluate alternatives to improve regional connectivity, provide an additional way traveling in a growing area of the Sun Corridor, and address current and future transportation needs is underway in Pinal County. The North-South Corridor Study spans about 55 miles between U.S. 60 in Apache Junction and I-10 in Eloy, passing through the city of Coolidge, town of Florence and portions of unincorporated Pinal County along the way. The study also incorporates the extension of State Route 24 from Ironwood Drive to the North-South Corridor.
The project will:
- address lack of capacity.
- improve the efficiency of existing freeway and arterial street networks.
- improve access to future activity centers.
- enhance transportation system linkages.
- create a more direct connection to the eastern portion of the Phoenix metropolitan area.
- perform functions and provide services identified in local, regional and statewide plans.
- evaluate potential multimodal facility (rail and utility) opportunities in the area.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
Milestone | Original Target Date | Current Target Date | Milestone Complete |
---|