Old Highway 41 Highway Road Widening and Operational Improvements
PROJECT WEBSITE: https://old-41-hwy-widening-0016410-gdot.hub.arcgis.com/
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
05/09/2025
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
Department of Transportation, Federal Highway Administration
Description:
The project is a roadway widening and realignment project located in Cobb County, Georgia. The proposed project would widen and realign the existing two-lane roadway between Kennesaw Avenue and Stilesboro Road. The total project length is approximately 0.71 miles. The roadway will be realigned to move the roadway to the north limit of the Kennesaw Mountain National Battlefield’s (KEMO) property. At the western end of the project, the Old 41 Highway/Stilesboro Road intersection will be reconstructed as a single lane roundabout with a westbound through bypass lane and a dedicated northbound to eastbound right turn lane. A second roundabout is proposed at Kennesaw Avenue. This roundabout will also provide a dedicated westbound through bypass lane. Between the proposed roundabouts, the project will widen the road to include two lanes in each direction, a raised median, and curb and gutter. The project also proposes the construction of a path tunnel beneath the south leg of the Old 41 Highway/Stilesboro Road intersection to allow park users to access the park’s amenities from the overflow parking lot without crossing Stilesboro Road.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
Milestone | Original Target Date | Current Target Date | Milestone Complete |
---|