Operations and Maintenance Facility South

PROJECT WEBSITE: Operations and Maintenance Facility South

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Complete

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE

icon_calendar

COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
05/27/2026

4 out of 4

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Department of Transportation

LEAD AGENCY
Department of Transportation, Federal Transit Administration

Other Agencies with Actions or Authorizations:

Department of Commerce

Department of Commerce, National Oceanic and Atmospheric Administration

Department of the Army

Department of the Army, US Army Corps of Engineers - Regulatory

Description:

The Operations and Maintenance Facility (OMF) South project would construct and operate a new OMF in the South Corridor of Sound Transit’s Link light rail system. The facility would be used to store, maintain, and deploy light rail vehicles (LRVs) for daily service. Additionally, the facility would receive, test, and commission new LRVs for the entire light rail system. The OMF South would accommodate administrative and operational functions, such as serving as a report base for LRV operators. Included is a Maintenance of Way building for maintenance and storage of spare parts for tracks, vehicle propulsion equipment, train signals, and other infrastructure, in addition to storage facilities for the entire Link light rail system. Other facility elements would include employee and visitor parking, operations staff offices, maintenance staff offices, dispatcher work stations, an employee report room, and areas with lockers, showers, and restrooms for both operators and maintenance personnel. Additionally, OMF South would need to have tracks connecting to a light rail line that will be operating when the facility is planned to open, which in southern King County is the Federal Way Link Extension FWLE. In addition to build alternatives, the project will consider a No Build alternative.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete