Pacific Northwest Rail Corridor Program: Oregon Segment
PROJECT WEBSITE: http://www.oregonpassengerrail.org/
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
04/30/2021
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
Department of Transportation, Federal Railroad Administration
Description:
The U.S. Department of Transportation’s (USDOT) Federal Railroad Administration (FRA) and the Oregon Department of Transportation (ODOT) has prepared a joint Tier 1 Environmental Impact Statement (EIS)/Record of Decisions (ROD) to evaluate options for improved Amtrak Cascades intercity passenger rail service. The Project examined the approximately 130-mile segment (Oregon Segment) of the federally designated Pacific Northwest Rail Corridor (PNWRC). The Oregon Segment of the PNWRC corridor runs from the Eugene-Springfield urban area to the Washington state line at the Columbia River in Portland, Oregon. Alternative 1, which is the Environmentally Preferred Alternative, would provide improved passenger rail service to meet future intercity travel demand, improve rail facilities, reduce journey times and improve connections with regional public transit services. This environmental review will help ODOT and FRA make decisions such as selecting the general rail alignment and communities where stations would be located and determining service characteristics, such as the number of daily trips, travel time objectives, and the technologies to be used. In September 2011, a $4.2‑million High Speed Intercity Passenger Rail (HSIPR) Program competitive grant from FRA helped fund this planning and service-level environmental analysis project.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|