Point of the Mountain Transit Project

PROJECT WEBSITE: https://udotinput.utah.gov/pointtransit

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Complete

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE

icon_calendar

COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
09/19/2025

2 out of 2

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Department of Transportation

LEAD AGENCY
Department of Transportation, Federal Transit Administration

Description:

The Utah Transit Authority (UTA) in collaboration with the Utah Department of Transportation (UDOT) propose to construct the Point of the Mountain (POM) Transit Project.  The POM Transit Project is a proposed 10‑mile‑long, high-capacity transit line to be constructed between Draper and Lehi, UT with up to 11 proposed stations, and supporting facilities. Three modes are being considered for the proposed transit line including bus rapid transit (BRT), light rail transit (LRT), and multiple-unit rail (XMU). UTA and UDOT plan to construct the transit line in partnership with the Wasatch Front Regional Council, Mountainland Association of Governments, Utah County, Salt Lake County, and the cities of Bluffdale, Draper, Lehi, Sandy, and South Jordan, UT.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete