PULGA PROFILE CHANGE PROJECT

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Complete

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE

icon_calendar

COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
04/06/2022

2 out of 2

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Caltrans

LEAD AGENCY
California, CalTrans

Description:

The California Department of Transportation (Caltrans) proposes a permanent restoration of roadway on State Route (SR) 70 in Butte County between post mile (PM) 46.0 and 47.0  by raising the existing roadway profile approximately 5 feet, replacing the Bear Creek Bridge (No. 12-0039) at PM 46.40, protecting the embankment with Rock Slope Protection (RSP), and installing a retaining wall to safeguard against future flood damage.

The proposed project occurs on the east bank North Fork Feather River (East Branch) within the Feather River Canyon in eastern Butte County, approximately 4.3 miles northeast of the town of Pulga and 25 miles northeast of Oroville

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.