Refugio Bridge Replacement
PROJECT WEBSITE: https://dot.ca.gov/caltrans-near-me/district-5/district-5-current-projects/refu…
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
05/02/2023
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects

LEAD AGENCY
California, CalTrans
Other Agencies with Actions or Authorizations:
Department of the Interior, Fish and Wildlife Service
Department of Commerce, National Oceanic and Atmospheric Administration

California
Department of the Army, US Army Corps of Engineers - Regulatory
Description:
The California Department of Transportation (Caltrans) proposes to replace the existing Refugio Road Undercrossing Bridges (#51-0215R and #51-0215L) along State Route 101 near Refugio State Beach in Santa Barbara County between postmiles (PM) 36.1 and 37.1. This project was initiated after concrete core testing and an inspection of the structures by Caltrans Structure Maintenance and Investigations documented the presence of alkali-silica reactive aggregate in the concrete and recommended that both structures be completely replaced. A detailed Advanced Planning Study was prepared by Caltrans Structures Design and four proposed bridge design alternatives were identified for bridge replacement.
The proposed improvements would maintain the existing northbound and southbound traffic lanes, maintain the same bridge lengths, alignments, profiles, and provide safety improvements including upgraded bridge rails. Bridge supports such as abutments and bents vary by project alternative. Each new bridge is proposed to be six feet and four inches wider than the existing structures. In addition to replacing the bridges, rails on the smaller northbound on-ramp bridge would be upgraded. The concrete-grouted rock slope protection in Refugio Creek would be modified to provide adequate passage for anadromous fish. Permanent vegetation control would be installed under metal beam guardrail, and at the gore tip of the southbound Refugio Road off-ramp.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
Milestone | Original Target Date | Current Target Date | Milestone Complete |
---|