Regional Mobility Pricing Project

PROJECT WEBSITE: http://www.oregontolling.org

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Cancelled

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
CANCELLED

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
N/A

0 out of 0

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Department of Transportation

LEAD AGENCY
Department of Transportation, Federal Highway Administration

Description:

The proposed project would apply congestion pricing on all lanes of I-5 and I-205 in the Portland, Oregon metropolitan area. Congestion pricing is being studied on I-5 between the Columbia River and the Boone Bridge in Wilsonville and on I-205 from the Columbia River to where I-205 intersects with I-5 in Tualatin. The limits of the routes to be priced may be adjusted during or after the environmental analysis.
Congestion pricing rates would be based on a set schedule. A set schedule would allow drivers to determine the cost of their trip ahead of time to plan their travel. Rates would be based on the portions if I-5 and I-205 a driver uses, the time of day, and the vehicle type. Drivers would be charged higher fees at congested locations during morning and afternoon rush hours and lower fees at less congested locations during other times of day. Drivers would pay through an all-electronic fee collection system. The Oregon Transportation Commission will set the rates prior to the start of congestion pricing. Rates would be monitored and periodically adjusted after pricing begins. 

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete