Rehabilitation or Replacement of Saugatuck River Swing Bridge
PROJECT WEBSITE: http://www.ct.gov/dot/cwp/view.asp?a=3893&q=581086
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
05/31/2027
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
Department of Transportation, Federal Highway Administration
Description:
The proposed project looks to rehabilitate or replace bridge no. 01349 (William F. Cribari Memorial Bridge) which carries Route 136 over the Saugatuck River in the town of Westport, Connecticut. CTDOT released a Bridge Rehabilitation Study Report in June 2016. This planning-level study recommends that the bridge either undergo major rehabilitation or replacement due to the critical condition of the bridge's trusses.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|