RIV 10 WILEY'S WELLS SRRA (WATER/WASTEWATER)

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

In Progress

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
01/06/2026

0 out of 1

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Caltrans

LEAD AGENCY
California, CalTrans

Description:

The purpose of this project is to provide a safe, sustainable and efficient water and wastewater system at the Willey’s Well Safety Roadside Rest Area (SRRA) that complies with applicable State and Federal statutes and regulations, and conserves limited maintenance resources. Caltrans owns and operates the Wiley’s Well SRRA water and wastewater system. State Statute §116555(a) (3) requires public water system owners to “provide a reliable and adequate supply of pure, wholesome, healthful and potable water.” Currently, the northside of I-10 at Wiley’s Well Road provide the SRRA for the public. The current public water system at project site is gradually reaching its design life and may not be able to accommodate the traffic growth and future site upgrade. Caltrans owns and operates onsite wastewater treatment systems (OWTS). State statute §13291 requires OWTS to treat the effluent such that discharge meets Regional Water Control Boards (RWQCB) Basin Plan water quality standards. The wastewater discharge system was recently upgraded at the site, with leach field.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete