RIV 60 REDLANDS BLVD IC IMPROVEMENTS (PSR ONLY)

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

In Progress

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
03/09/2027

0 out of 1

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Caltrans

LEAD AGENCY
California, CalTrans

Description:

The City of Moreno Valley, in cooperation with the California Department of Transportation (Caltrans), District 8, proposes to reconstruct and improve the SR60/Redlands Boulevard interchange. SR-60 is an east-west principal arterial according to the Transportation Concept Report (TCR) for SR-60 (September 2012) within Los Angeles, San Bernardino, and Riverside Counties. The project site is located in the City of Moreno Valley between SR-60 Post Mile (PM) 19.0 and PM 21.0. Build out of the area will generate substantial traffic growth on the freeway and on Redlands Boulevard at the interchange. The purpose of the project is to alleviate existing and future traffic congestion at the SR-60/Redlands Boulevard interchange ramps during peak hours, to improve traffic flow along the freeway and through the interchange, to improve safety by upgrading the geometry at the current interchange, and to provide standard vertical clearance for the Redlands Boulevard overcrossing.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete