RIV 86 CONSTRUCT NEW IC AT AVE 50 & BRIDGE OVER COACHELLA CHANNEL
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
05/07/2019
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
California, CalTrans
Other Agencies with Actions or Authorizations:
California
Description:
The City of Coachella, in cooperation with the California Department of Transportation (Caltrans) District 8 and the Coachella Valley Association of Governments (CVAG), proposes the construction of a new interchange at State Route 86 (SR-86) and Avenue 50, approximately 1.1 miles north of the existing Avenue 52 intersection and 1.95 miles south of the existing Dillon Road interchange. The proposed project would convert portion of SR-86 from existing expressway to freeway with a new overcrossing structure and access ramps, which would accommodate traffic for existing and planned development in the area. The project would also improve safety and traffic operations by enhancing level of service (LOS) on the adjacent SR-86/Dillon Road interchange and SR-86/Avenue 52 intersection.
The proposed improvements include realignment and widening of Avenue 50 from the existing two-lane roadway to a six-lane major arterial, and realignment of Tyler Street on both the east and west side of SR-86. The project would also improve public safety and mobility by constructing another new bridge spanning over Coachella Valley Stormwater Channel (CVSC), replacing the existing low water crossing, and eliminating flood-related hazards during inclement weather events.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|