ROUTE 371 (CAHUILLA ROAD) BICYCLE AND PEDESTRIAN

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Paused

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
PAUSED

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
SUBJECT TO CHANGE

0 out of 1

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Caltrans

LEAD AGENCY
California, CalTrans

Description:

This project proposes to study multimodal transportation improvements, including but not limited to; a Class I two-way shared use path exclusively for bicyclists and pedestrians adjacent to SR-371 but separated from the roadway (including culvert repairs / extensions as needed); Class II bike lanes with painted buffer; sidewalks through the town of Anza; high visibility crosswalks where appropriate; and shoulder widening where needed to accommodate bike lanes. An existing marked crosswalk at Contreras Road will be upgraded for higher visibility, along with upgrading existing curb ramps to Americans with Disabilities Act (ADA) standards. Additional improvements are proposed at existing bus stop locations as Caltrans intends to engage with partners to evaluate the viability of transit services to destinations along the route.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete